LUMIArchLab / Energy workspace
Building decisions, with evidence.
Create or select a project to begin.
01 / Identity before interpretation
Upload your geometry.
Upload your geometry-only IDF. We will read its zones, spaces and surfaces and guide you through the missing building inputs. Weather files can be added later.
Uploads are saved privately to your project. UTF-8 IDF/EPW/DDY only. IFC, CAD and Revit conversion are not implemented.
Stored source files and fingerprints
02 / Read what is there. Ask what is missing.
Model readiness.
Missing / uncertain inputs
The backend will ask only for the fields that are missing or uncertain in its supported checks.
Zone classification and conditioning
Advanced scenario tools · optional
03 / Explicit choices. Versioned assumptions.
Envelope, schedules and systems.
Project values must come from your drawings, technical inputs or stated study assumptions. The built-in example is synthetic, not a set of code minima.
PTAC, PTHP and a shared boiler/chiller plant with four-pipe fan coils or convective hot-water baseboards are supported. Other HVAC topologies require supported complete native models; no silent substitution.
04 / A reproducible preparation step
Prepare immutable model candidates.
No EnergyPlus execution occurs during preparation. A failed geometry or dependency gate remains failed; the raw inputs and failure events are retained.
05 / Persistent jobs, not a timed animation
Run history.
Runs stay associated with the same project and building ID.
A separate worker process handles queued jobs. “Running” is recorded only after the native process actually starts. Closing a browser does not delete the job.
Import existing output files — not a new simulation
Private project import. Prior CSV and log files stay labelled historical and cannot establish source-model fidelity.
06 / Results first. Claims only when supported.
Energy and validation.
Record your QA review
Review the actual warnings and explain each disposition. A review cannot override severe errors, incomplete results or unmet-hour limits.
Report links expire after one hour and provide access to the report only.
Evidence assistant
Understand the next step.
Get practical explanations of building inputs and quality checks for your selected run.